1.
Aditya L, Eriawan E, Albahar AK. Reliability Analysis of OCR Relay with ETAP 19.0.1 Simulation to Anticipate Disturbances in Bemo Feeders at the Cawang Lama Substation. JTEIN [Internet]. 2025 Feb. 13 [cited 2026 May 16];6(1):29-37. Available from: http://jtein.ppj.unp.ac.id/index.php/JTEIN/article/view/740