[1]
L. Aditya, E. Eriawan, and A. K. Albahar, “Reliability Analysis of OCR Relay with ETAP 19.0.1 Simulation to Anticipate Disturbances in Bemo Feeders at the Cawang Lama Substation”, JTEIN, vol. 6, no. 1, pp. 29-37, Feb. 2025.