ADITYA, Lukman; ERIAWAN, Eriawan; ALBAHAR, Abdul Kodir. Reliability Analysis of OCR Relay with ETAP 19.0.1 Simulation to Anticipate Disturbances in Bemo Feeders at the Cawang Lama Substation. JTEIN: Jurnal Teknik Elektro Indonesia, [S. l.], v. 6, n. 1, p. 29–37, 2025. DOI: 10.24036/jtein.v6i1.740. Disponível em: http://jtein.ppj.unp.ac.id/index.php/JTEIN/article/view/740. Acesso em: 23 jul. 2026.