(1)
Aditya, L.; Eriawan, E.; Albahar, A. K. Reliability Analysis of OCR Relay With ETAP 19.0.1 Simulation to Anticipate Disturbances in Bemo Feeders at the Cawang Lama Substation. JTEIN 2025, 6, 29-37.