[1]
Aditya, L., Eriawan, E. and Albahar, A.K. 2025. Reliability Analysis of OCR Relay with ETAP 19.0.1 Simulation to Anticipate Disturbances in Bemo Feeders at the Cawang Lama Substation. JTEIN: Jurnal Teknik Elektro Indonesia. 6, 1 (Feb. 2025), 29-37. DOI:https://doi.org/10.24036/jtein.v6i1.740.