Implementation of Early Warning System on SMART VU SCADA PT PLN (Persero) With LED Warning Lights

##plugins.themes.academic_pro.article.main##

M . Fadil
Mukhlidi Muskhir

Abstract

Electric power distribution is a crucial element in meeting the needs of the community, especially in the workshop and electronic equipment repair sector. The transmission process aims to optimize efficiency and reduce power losses. PT PLN (Persero) UP2D SUMBAR has a high commitment in responding to the needs of the community, related to the distribution of electricity, especially in the 20 KV distribution network. Although it already uses two Early Warning Systems connected to SMART VU SCADA, the DCC room alarm sound is disabled to minimize noise. Therefore, this research focuses on implementing an additional Early Warning System with LED warning lights. The research methodology includes literature study, initial testing (Experimental Method), system design, hardware design, second testing (successful/unsuccessful), direct testing in the DCC room, and analysis of results. It is expected that this research can improve alarm notifications, speed up dispatcher response time, and increase vigilance in handling disturbances in the 20 KV distribution network.

##plugins.themes.academic_pro.article.details##

How to Cite
Fadil, M., & Muskhir, M. (2024). Implementation of Early Warning System on SMART VU SCADA PT PLN (Persero) With LED Warning Lights. JTEIN: Jurnal Teknik Elektro Indonesia, 5(1), 195-210. https://doi.org/10.24036/jtein.v5i1.663

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.